Partners
06.02.2012
Home > IC-News > Article

Smaalenene bridge connecting Spydeberg and Askim at the new E18 between Oslo and Stockholm

New bridge finished

Lysbilde1_350x263 Last week the new bridge between Spydeberg and Askim was finally ready. The bridge which is 300 meter long has a tower at 88 meter and is founded on a 24 meter high column rising from the bottom of river Glomma. The German Bilfinger Berger has carried out the construction works on behalf of the Norwegian state road authorities. The bridge is a part of the larger new E18 motor way project, connecting Oslo and Stockholm. For the towns and settlements in between each new part of the project is a victory itself as the local politicians have been very active in fund raising. Unpopular toll roads are parts of this.

 (All info and photos from local newspaper Smaalenens Avis)

The mayor of Askim Trygve Westgaard and the Mayor of Spydeberg Brit Egeland Gulbrandsen contributed to the last final symbolic concrete work on the bridge. A small seremony wihere all stakeholders were present Monday 11th May.

The bridge and the new road will mean a lot for the regional development in "Indre Østfold Region". It will cut the driving time with at least 10 minutes from Askim to Oslo center when all works are done. However, some important parts of the road will not be finished before after another 5-10 years. The new road which will be officially opened later this year will also lead most of the traffic outside Spydeberg center and this is a challenge for local trade businesses at the same time as it gives a big opportunity for reconstruction of the small town center. Spydeberg has been working on a new startegy for cnter develeopment and through the projects Innovation Circle and Transinform teh municipality has gained many new ideas and proposals. The first draft of the plan is expected to be presented in the autumn 2010, at the same time as the new road will be opened.